Instructor Led Material Resources Training - Training Resources
Material Resources Training Provider? - Tell us about your Training!
From World Class Productivity Inc
Hands-on Microsoft Project

The first version of our 2-day Hands-on Microsoft Project course was developed in 1999, and was based on Microsoft Project version a 98. Since then, there have been numerous upgrades to Microsoft Project, and our original course has kept pace, with updated courseware for MSP versions 2000, 2002, 2003, and, now 10 years later, 2007.
The secret to this coursea s success, and its 10-year long
more...
From Microcomputing Solutions ltd
Advanced Microsoft Project
...
a Using Work Contours
a Resource Availability
5 Material Resources
a Defining Material Resources
a Assigning Material Resources
a Editing Assignments
a Using Work Contours
6 All about Costing
a Set Rates for Resources
a Using the Accrue at setting
a Varying Rates for Resources
a Working Overtime
a Using Materials
a Fixed Costs
7 Tracking a
more...
Intermediate Microsoft Project
Objectives: This is a second stage course for project management software
Pre Requisites: A basic level understanding of Microsoft Project is recommended.
Duration: 1 day
The topics covered are as follows:
1 Revision
a Topics from the Introduction day
a Revision Exercise
2 Using Standard Views
a Changing to Different Views
a Using other Tables
a Hiding Tasks with
more...
From Power-Tech Engineers, Inc
Primavera 6 courses 102 106 Togather



...
a Identify the differences between labor, nonlabor and material resources
a View the resource dictionary
Assigning Roles
a Assign roles to an activity
a Assign rates on roles
Assigning Resources and Costs
a Assign resources by role
a Assign labor, nonlabor, and material resources to activities
a Adjust Budgeted Units/ Time for a resource
a Assign expenses to
more...
From Training Connection
Project Training
...chedules
How To Assign Work Resources
How To Assign Material Resources
Unit 9: Working With Project Costs
How To Enter Project Costs
How To Enter Fixed Costs
How To View Costs
Unit 10: Exploring Views
How To Apply The Task Usage View
How To Apply The Resource Usage View
How To Apply The Calendar View
How To Apply The Gantt Chart View
Unit 11: Examining
more...
From Apparel Training Centre
Work - Study Starter Pack
... in order to improve the effective use of human and other material resources. (British Standard 3138 1992)
Introduction
This five-day Work-Study course consists of three main elements, Work Measurement, Method Study and the use of Standard Minutes.
The fundamental objective is to introduce techniques which will assist manufactures in producing products, Better (quality) Cheaper (lower
more...
Work - Study Starter Pack
... in order to improve the effective use of human and other material resources. (British Standard 3138 1992)
Introduction
This five-day Work-Study course consists of three main elements, Work Measurement, Method Study and the use of Standard Minutes.
The fundamental objective is to introduce techniques which will assist manufactures in producing products, Better (quality) Cheaper (lower
more...
