Audience
Employees who need to learn how to use the QM component of R/3 System; members of project teams (organizational and conceptual phases) for QM implementation. All employees working in this area. There are no prerequisites for participating in the course.
Objective
- QM Inspection Processing.
- QM in Materials Management.
- Variants in Quality Management.
- QM Inspection Completion.
- Inspection Lot Completion.
- Quality Notifications.
Topics Include
Unit 1: QM - Inspection Processing
- QM in Materials Management: - Purchasing process. - Influence of QM on Purchasing.
- Variants in Quality Management: - Processing Lots without a plan. - Processing lots with a plan. - Defects Recording.
Unit 2: QM - Inspection Completion
- Inspection Lot Completion: - Usage Decision. - Quality scores. - Quantity transfer postings.
- Quality Notifications: - Structure of quality notifications. - Corrective measures with notifications. - Vendor complaints.
Duration
4
Minimum Requirements
The CDROM version of this course requires:
- At least a 486DX 33Mhz CPU.
- Microsoft Windows 3.1 or higher and a Microsoft compatible mouse.
- At least 8MB RAM.
- At least VGA graphics capability with a minimum 512K video RAM (1MB video RAM recommended).
- At least a double speed CDROM drive.
- An MPC compliant sound card with attached speakers or headphones is recommended (Currently only the CDROM version supports audio).
The network version of this course requires:
- At least a 486DX 33Mhz CPU.
- Microsoft Windows 3.1 or higher and a Microsoft compatible mouse.
- At least 8MB RAM and 22MB available hard disk space or file server space.
- At least VGA graphics capability with a minimum 512K video RAM (1MB video RAM recommended).
Media
Serebra Learning Corporation 119 - 7565 132nd Street Surrey BC V3W 1K5 Canada