Custom Search

SAP R/3 PP: Production Order Processing and Capacity Planning

PP - Production Planning

Serebra Learning Corporation
Training Provided by Serebra Learning Corporation

The course SAP R/3 PP: Production Order Processing and Capacity Planning provides an understanding of the production order processing within SAP R/3 MRP (Material Requirement Planning). It takes the learner through a whole production process and focuses on specific subjects of the process within each lesson. The course covers the whole range of Production Order from creation to execution as well as Capacity Planning where the trainee will learn to use various analysis reports and planning tables.

This is primarily online training
on-line e-learning cbt (computer based)This is an online eLearning or CBT training program
Contact Serebra Learning Corporation for more information
Duration:4 hours
Training Presented in:English
SAP R/3 PP: Production Order Processing and Capacity Planning

Audience

Primarily engineers technicians and experienced employees from various technical and administrative departments. The course is also directed to support controlling manufacturing planning job preparation and other areas of production logistics. There are no prerequisites for participating in the course.

Objective

  • Creating and Processing Production Orders.
  • Component and Operation Processing.
  • Confirming Production Orders.
  • Capacity Planning Within the R/3 System.
  • The Basics of Capacity Planning.
  • Capacity Evaluations.

Topics Include

Unit 1: Processing Production Orders

  • Creating Production Orders: - Creating Production Orders. - Creating Production Orders Manually. - Production Orders without Materials.
  • Processing Components and Operations: - Processing Components. - Processing Operations. - Processing Missing Parts.
  • Confirming Production Orders: - Confirming Orders in R/3. - Entering Standard Confirmations. - Shop Floor Information System. - Order Information System.

Unit 2: Capacity Planning in R/3

  • Basics: - Introduction to Capacity Planning. - Available Capacity. - Capacity Requirements.
  • Capacity Evaluations: - Standard Overview. - Detailed Capacity List. - Variable Overview.
  • Capacity Leveling: - Principles of Capacity Leveling. - Interactive Capacity Planning Table.

Duration

4

Minimum Requirements

The CDROM version of this course requires:

  • At least a 486DX 33Mhz CPU.
  • Microsoft Windows 3.1 or higher and a Microsoft compatible mouse.
  • At least 8MB RAM.
  • At least VGA graphics capability with a minimum 512K video RAM (1MB video RAM recommended).
  • At least a double speed CDROM drive.
  • An MPC compliant sound card with attached speakers or headphones is recommended (Currently only the CDROM version supports audio).
The network version of this course requires:
  • At least a 486DX 33Mhz CPU.
  • Microsoft Windows 3.1 or higher and a Microsoft compatible mouse.
  • At least 8MB RAM and 22MB available hard disk space or file server space.
  • At least VGA graphics capability with a minimum 512K video RAM (1MB video RAM recommended).

Media


Serebra Learning Corporation 119 - 7565 132nd Street Surrey BC    V3W 1K5 Canada
About The Training Provider: Serebra Learning Corporation
Serebra Learning Corporation - Serebra Learning Corporation provides technology-based training solutions through a combination of Cortex, its proprietary learning management system (LMS), and a curriculum catalog with over 1, 825 current courseware titles. Founded in 1987 (as FirstClass Systems, with a name change to Serebra in 2001), Serebra has over sixteen years" experience delivering e-learning solutions to both...
tcw11-gfc-v396M-10/25/09-10:37:54-()[A]-[B]-[B] -01:34:32