Training
Provided by 123-CBT Computer Based Training
The Computer Based Training (CBT) SAP R/3 PP: Production Planning MP and MRP describes the production planning process and explains how it works. Upon completing this course, the trainee will be able to describe the various planning strategies and their applicability in different types of industries and identify the integration points with Materials Management, Sales & Distribution, Financial Accounting and Controlling modules. Furthermore, the learner will identify the costing elements and their use in calculating planned costs; define the basic organizational units in Production Planning; define routing, operations and work centers and their inter-relationships as well as identify the different points of integration of the Production Planning module within SAP.
Learn To:
o Features and Strategies in MP. o Planning Strategies. o Selected Features of MP. o Long-term Planning. o Planning Results and Features in MRP. o Planning Results on the MRP Level. o Demand Coverage by External Procurement. o Demand Coverage by Inhouse Production.
Audience
Employees who need to learn how to use the R/3 System. There are no prerequisites for participating in the course.
Deployment Options
Internet / Intranet, Download, LAN, Workstation
Accreditation
NASBA credits: 4 CPE Credits
Language Options
American English, UK English
Total Learning Time
3 to 4 hours
13490 Objectives
Unit 1: Functions and Strategies in MP 1.5 - 2 hours o Planning Strategies: - Planning Strategy and Consumption Mode. - Planning with Final Assembly. - Planning without Final Assembly. - Subassembly Planning. o Selected Functions of MP: - Copying Data from SOP. - Version Management. - Additional Functions in MP. o Long-Term Planning: - Long-Term Planning. - The Planning Run in Long-Term Planning. - Interactive Requirement Evaluations. - Long-Term Planning Functions.
Unit 2: Results and Functions in MRP 1.5 - 2 hours o Planning Results at the MRP Level: - Results at the MRP Level. - MRP Procedures. o Requirements for External Procurement: - Requirements for External Procurement. - Cross-Plant Planning. - Procurement Quota Arrangement. - The PPC Planning Calendar. o Requirements for Inhouse Production: - Analyzing Capacities in MRP. - Availability Checks. - Integrated Lot-Sizing Procedures.
Training Avaliability and Delivery
This is primarily online training
This is an online eLearning or CBT training program
This program may be available on CD
Contact 123-CBT Computer Based Training for more information
About 123-CBT Computer Based Training - Training Provider
123-CBT Computer Based Training - 123-CBT offers discount pricing on top quality eLearning
programs from leading computer based training providers. Many of the training courses are available both online or on CD so that you can study at home at your own pace:
E-Learning available for
- ABAP 6.10
- Access 2003
- Acrobat 6.0
- ASP
- ASP.NET
- C
- Captivate 1.0
- Crystal Reports 8.5
- Crystal Reports v10
- Dreamweaver MX
-...
More SAP R 3 v4 5 Training from 123-CBT Computer Based Training