Provided by: Global Technical Training - South Africa Under standing Boiler Tube Failures part 1Engineering |
![]() |
Boiler tube failures are the leading cause of steam plant non-reliability.
A tube failure may cause a forced outage, usually at the most inopportune time.
The outage results in lost production and lost revenue.
A reduction in the frequency of tube failures can be achieved by understanding the root cause of the failure and taking steps to eliminate the problem. How can you focus these efforts?
The first step in preventing tube failures is understanding why a tube failure occurred. With this information, you can perform preemptive repair, replacement, or alter the tube environment.
Tube failures mechanisms are presented with actual case histories from industry.
A tube failure may cause a forced outage, usually at the most inopportune time.
The outage results in lost production and lost revenue.
A reduction in the frequency of tube failures can be achieved by understanding the root cause of the failure and taking steps to eliminate the problem. How can you focus these efforts?
The first step in preventing tube failures is understanding why a tube failure occurred. With this information, you can perform preemptive repair, replacement, or alter the tube environment.
Tube failures mechanisms are presented with actual case histories from industry.
|
|
||||||||||||
Training
Provided by Global Technical Training - South Africa
- U asked: do you have online courses? About power plant chemistry and power plant metalurgy?
- M asked: how do i find u guys and study with u?
- T asked: I need information on part and part on understanding boiler tube failures. I am looking to have two of my employees trained. I need to know cost etc. I am based out of Oregon and work for . Ph
- J asked: I am a maintanence supt on an FPSO. We have boilers (one in use and one standby) supllying steam for the corgo pumps and the water purifier unit. I would like to know whether you have a steam certification course that I can attend or do via correspondence.
- asked: i request sir please send informatoin for the purpose project work thank you sir
- asked: how to reduce the erosion in CFBC boilers?
Under standing Boiler Tube Failures part 1
Training Program Details
Part 1
Long-term Overheating
Dissimilar Metal Weld (DMW) Failure
Water and Steam formed deposits
Waterside Corrosion Fatigue
Oxygen Pitting
Caustic Related cracking
Acid Attack
Metallic Copper Deposits.
Chelant corrosion
Fire Site Ash Corrosion
Short-term Overheating
Why metallurgical examination
Summary
Long-term Overheating
Dissimilar Metal Weld (DMW) Failure
Water and Steam formed deposits
Waterside Corrosion Fatigue
Oxygen Pitting
Caustic Related cracking
Acid Attack
Metallic Copper Deposits.
Chelant corrosion
Fire Site Ash Corrosion
Short-term Overheating
Why metallurgical examination
Summary
About The Training Provider: Global Technical Training - South Africa
Global Technical Training - South Africa - Global Technical Training Team has been formed by those involved in the engineering industry for those involved in the engineering industry.
The mission of Global Technical Training is to develop and organize short technical courses. We specialize in open short courses, presented by selected experts from the industry. Usually the length of a course is between 1 and 4 days.
The key...